NEC4 · JCT · FIDIC · Primavera P6

Programmes that stand up to scrutiny. Change that gets paid. Delay that's proven.

End-to-end project controls for contractors, clients and supply chains: from the Clause 31 first programme through monthly Clause 32 revisions, Clause 62 quotations, risk modelling and, when needed, forensic delay analysis.

Clause 31 / 32Clause 60–65 CEsSCL Protocol QSRA P50 / P80EVM · ESDCMA 14-point
PROGRAMME REVISION 07 · DATA DATE 14-NOV■ critical ■ non-critical
Activity Q1Q2Q3Q4 Design & approvalsProcurementEnabling works FoundationsStructureM&E install CommissioningCompletion ◆ P80 →
◆NEC4 ECC◆NEC4 ECS◆NEC3◆JCT 2024◆FIDIC 2017 ◆SCL Delay & Disruption Protocol◆AACE 29R-03◆AACE 57R-09◆DCMA 14-point ◆ISO 21508 EVM◆Primavera P6◆Power BI◆Monte Carlo QSRA◆Earned Schedule
One partner, the whole programme lifecycle

From tender programme to final account, and beyond if it's disputed

Most firms cover one slice. We stay with the programme the whole way, so the record we build in month one is the evidence that protects you in month thirty.

Plan

Tender & Clause 31 first programme, Scope review, time risk allowance, logic & resources.

cl. 31 · 50.5

Control

Monthly Clause 32 revisions, progress, narratives, EVM & variance reporting.

cl. 32 · 31.3

Change

Early warnings, CE notifications, Clause 62 quotations and programme impacts.

cl. 15 · 61 · 62 · 63

Risk

QSRA / QCRA Monte Carlo, risk registers, P50/P80 completion and contingency.

cl. 31.2 TRA

Resolve

Forensic delay & disruption analysis, EOT claims, adjudication & expert support.

SCL · AACE 29R-03
Services

What we do

Buy one service or the full lifecycle. Available as fixed-fee packages, monthly retainers or embedded planners.

NEC4 CLAUSE 31

First programme preparation

A first programme that is fully compliant with clause 31.2, built for acceptance and to get your retention of a quarter of the Price for Work Done to Date released (cl. 50.5).

Learn more →
NEC4 CLAUSE 32

Revised programme submissions

Monthly updates with progress, CE effects, mitigation and a clear narrative, so the Accepted Programme stays current and defensible.

Learn more →
CLAUSES 15 · 60–65

Change & compensation events

Early warnings, CE notifications, Clause 62 quotations with time impact analysis, and registers that track every pound and day.

Learn more →
SCL PROTOCOL · AACE 29R-03

Forensic delay analysis

Windows, TIA, as-planned vs as-built and collapsed as-built analysis for EOT claims, defence and dispute resolution.

Learn more →
MONTE CARLO

QSRA & QCRA

Quantitative schedule and cost risk analysis: P50/P80 dates, contingency, risk drivers and tornado charts that boards understand.

Learn more →
EVM · ISO 21508

EVM & variance reporting

Earned value and earned schedule, S-curves, CPI/SPI, EAC forecasts and monthly variance reports with root-cause commentary.

Learn more →
CLIENT-SIDE

Programme assurance & review

Independent review of contractor programmes: DCMA 14-point checks, cl. 31.3 acceptance advice and critical path validation.

Learn more →
SUPPLY CHAIN

Contractor management tool

One place for subcontractor programmes, progress, look-aheads and performance scorecards, rolled up into your master programme.

Learn more →
UPSKILL

Training & embedded planners

NEC4 programme workshops, P6 coaching, and interim planners and project controls staff for peaks in workload.

Learn more →
Our own technology

Consultancy backed by software we built

Every engagement runs on P6 Schedule Analytics by PlanAssure, our platform for Primavera P6 XER and XML files. Your programme is health-checked, the critical path is recomputed from the logic, and risk is modelled in minutes instead of days.

  • DCMA 14-point assessment that lists every offending activity
  • NEC4 module: Key Dates, EW/CE registers and clause 31/32 checks
  • Forensic, trend & windows delay analysis between updates
  • QSRA Monte Carlo, earned value and earned schedule
  • Repair XER: fixes logic defects and writes a file that imports back into P6
MODULE

Schedule Health

DCMA 14-point plus 25 diagnostic Insights, with evidence behind each one.

MODULE

Submission Review

Compare this month's programme with last month's: what moved, what was re-logicked, what disappeared.

MODULE

Schedule Risk (QSRA)

Monte Carlo simulation over the live network with a linked risk register.

MODULE

Time-Chainage

Linear-works view for rail, highways, pipelines and overhead lines.

Who we work for

Both sides of the contract

Main contractors

Accepted programmes, CE quotations that hold up, monthly reporting and EOT claims, so the time and money you're entitled to is recovered.

Clients, PMs & PMOs

Independent programme assurance, acceptance and non-acceptance advice, Project Manager's assessments (cl. 64), QSRA for funding gateways and portfolio reporting.

Subcontractors & SMEs

Affordable, compliant programmes and quotations for NEC4 ECS, with on-call support when the main contractor pushes back.

SECTORS

Power transmission & distributionOffshore & onshore windRail HighwaysWater & AMP8Buildings Civils & earthworksNuclear & defence
Results

Recent work

All case studies →
What clients say

Trusted on programmes that matter

MEMBERSHIPS & ACCREDITATIONS

How to engage us

Simple, transparent engagement

01

Free health check

Send us your XER. Within 48 hours you get a DCMA and clause 31.2 compliance summary.

02

Fixed-fee packages

First programme, CE quotation, QSRA or a delay report, each with a defined scope and price.

03

Monthly retainer

Clause 32 revisions, CE support and reporting each month, without a full-time hire.

04

Embedded / interim

Planners and project controls managers on site or remote, from days to years.

Is your next programme submission at risk of non-acceptance?

Get a free compliance and health check on your P6 programme before you submit.

Request a free health check