Drop in a Primavera P6 XER export and get a DCMA-style quality score with NEC4 pointers in seconds. It runs entirely in your browser: your programme is never uploaded.
Drop your XER file here
or
From P6: File → Export → Primavera PM (XER). Up to 80 MB.
Checked in your browser. Never uploaded to a server.Thresholds follow the DCMA 14-point assessment, applied to incomplete activities. They're industry benchmarks, not NEC4 terms. Durations and float are converted from hours with each activity's own calendar; total float is used as P6 calculated and stored it, and CPLI counts working time on the calendar, holidays included. Check 12 traces the stored critical flags rather than rescheduling; 11 and 14 need the baseline.
Open ends, leads, lags and relationship types: whether the network will move as the work does.
Hard constraints, negative float and suspiciously high float that hides missing links.
Invalid dates against the data date, a continuous critical path, and a quick CPLI estimate.